3. Immediately after rig positioning, drive the casing into the ground. Generate steel casing to your bare minimum a depth of 1 m beneath the ground level to take lateral loads and movements at web-site. The metal casing also combat troubles as a result of groundwater during piling. In situations https://charlesu608wyl8.wikihearsay.com/user