If a type of criteria is located to obtain an important deficiency, the contractor’s total system is deemed to become unacceptable. In cases like this, don't just need to the contractor obtain consent to subcontract, in accordance with DFARS 252.242-7005, which is needed to get A part of CAS covered https://cpsr62693.ambien-blog.com/40166231/what-does-contractor-purchasing-system-review-mean