Project Summary Newsome has recently delivered the installation and commissioning of a new 400 kW chiller at a major confectionery manufacturing site in York. This initiative demonstrates a notable step forward in the client’s ESG commitments, enhancing process stability and delivering measurable reductions in both energy consumption and carbon footprint. https://one-bookmark.com/story20651335/energy-efficient-400-kw-chiller-installation-achieves-50-000-yearly-energy-savings-and-200-metric-tonnes-co%E2%82%82-reduction